Repainting the Hull
So I decided to remove all the bitumen below the waterline and repaint with an industrial coating to give more protection to the steel hull and then reapply the bitumen from the waterline down.
The bitumen was removed from the starboard side first, then washed down with water and left overnight to dry. The next day it was then sanded down with 60 grit discs using an angle-grinder, followed with a wire brush on the same angle-grinder. The dust was brushed off and washed with panel wipe and then 2 coats of paint applied. Weather permitting the Port side from the mid- line to the bow will be started next week.
The bitumen was removed from the starboard side first, then washed down with water and left overnight to dry. The next day it was then sanded down with 60 grit discs using an angle-grinder, followed with a wire brush on the same angle-grinder. The dust was brushed off and washed with panel wipe and then 2 coats of paint applied. Weather permitting the Port side from the mid- line to the bow will be started next week.